Smile Politely

Blair Park is about to get a makeover

I’ve always felt like Blair Park lacks a bit of an identity. It’s pretty big, and I’ve spent a lot of time there watching T-ball and tennis lessons, but beyond those things it’s not much of a destination when compared to other area parks. 

Now, with a $400,000 Open Space Land Acquisition and Development grant from the state, it’s going to get a little love and a lot of cool additions. From the Urbana Park District website:

Some highlights of the Blair Park plan include:

  • 8’ wide multi-use path on north and west sides to create perimeter loop trail—the highest need based on the community’s input
  • New playground with separate 2-5 and 5-12 age appropriate equipment
  • Half-court basketball
  • Electronic Sutu wall can be used by all ages and athletic abilities, as well as by a single person or larger group to play interactive games with soccer, tennis, and volleyballs—even snowballs allow you to interact with the impact-sensitive panels!
  • Challenge course for teens and adults to exercise and engage in friendly competition
  • Accessibility upgrades to horseshoes and t-ball
  • 6’ wide connector paths between park amenities

The projects will take two to three years to complete. 

Top image: A park pavillion with round wooden posts and a brown roof. There are several picnic tables inside the pavillion. It is surrounded by green grass and there are leafy trees next to it. Photo from Urbana Park District website.

More Articles